CLIENT
Bay Country Club
LOCATION
Sunny Isles Beach, FL
DURATION
2016 – Summer 2019
Bay Country Club
Concrete Restoration, Post-Tension Repairs, Painting and Waterproofing
13-story condominium including 4 levels of garage. Scope consisting of concrete and post tension cable repairs; removal and reinstallation of railing, storm shutters, windows and sliding glass doors; painting; waterproofing; seawall repairs; pool deck and paver repairs and restoration.